⌂ Home Data last updated: 2026-10-15 17:33 UTC (2026-10-15 23:03 IST) ·

Wodisang

all dams · full registry · dam table · generated 2026-10-15 23:03 · PIC GJ04MH0553 · CRS EPSG:32642

6current scenarios
6renderable
0running again
0retired · not in master
report: current — V2 delivery, DBA/EAP/PCI bytes match CURRENT_DELIVERY_INDEX d9277f54 (ACTUAL_FOCUSED_ATLAS_TWO_ROOT_DELIVERY_READBACK; format PASS) Verdict from the current delivery index (~/100_Dams_Deliverables/CURRENT_DELIVERY_INDEX.json), else the delivery roots (~/final_100_dam_delivery, ~/final_100_dam_codex_report_delivery); the report thread has filed no note for this dam (REPORT_STATUS.json).

Salient features (as used in the runs)

From the supplied salient-features document and the dam's dem_correction.csv datum authority — also in registry.csv by column name.

Dam code (PIC)GJ04MH0553
DistrictJamnagar
TalukaJamnagar
RiverFulzar
Projected CRSEPSG:32642 / UTM Zone 42N (WGS 84)
Dam typeRolled filled zone type
FRL (m)76.5
HFL (m)79.0
Top of dam (m)80.9
Spillway crest (m)76.5
Gross storage (Mm³)7.099
Catchment (km²)229.21
Bed level, adopted (m)65.7
Head, documented (m)15.2
Head in DEM before correction (m)10.196
Head after DEM correction (m)15.2
SolverShallow Water Equations - Eulerian Method (SWE-EM) solver
✓ DONE — evidence and every asset family present and verified.
Every package listed below is current. The master never holds a superseded or defective artefact — replacements overwrite on acceptance and the retired copy is removed in the same action (verified by audit_master_store.py).

Scenarios

run idcanonicalstatus bandvol err %distinct n Q modelled (breach only)Q_semistation W_bpackage in mastersha256accepted
S_EG_00S02-FW-PIPretainedclean0.2071,786.721,968.47411.0035.08../Wodisang/S_EG_00__S02-FW-PIP/68e92ffb5e579c682026-09-17T18:59
S_EG_00_REFS01-FW-REFretainedclean0.007————../Wodisang/S_EG_00_REF__S01-FW-REF/1f34271306ded7da2026-09-17T18:44
S_EG_01S03-DF-REFretainedclean0.007————../Wodisang/S_EG_01__S03-DF-REF/983ad7eba9ae172e2026-09-17T18:52
S_EG_03S05-DF-PIPretainedclean0.0373,257.933,765.42411.0045.84../Wodisang/S_EG_03__S05-DF-PIP/f7caa13ccd0e03fd2026-09-17T19:07
S_EG_05_SBLS08-SO-Lretainedclean0.0272,960.90—475.0060.00../Wodisang/S_EG_05_SBL__S08-SO-L/c1bf23aa47aea3dc2026-09-27T05:50
S_EG_05_SBRS09-SO-Hretainedclean0.0272,961.09—786.7060.00../Wodisang/S_EG_05_SBR__S09-SO-H/7a886f5f6c5692a02026-09-27T05:50

Assets